Description
This project practically shows how to configure IP Version 4 (IPv4) static IP unicast routing on the Catalyst 2960-S and 2960 switch. By default, any layer 2 switch does not support routing between different networks. Layer 2 switch only switches the packets between the network devices connected in single LAN. But, here in this project we will use the built-in switch templates to route packets between two or more different networks by altering the configuration of Cisco Catalyst Switches.
Pre-requisites/Implementation Technologies
Pre-requisites |
---|
1 . Basic knowledge on LAN and VLAN is preferred |
2 . Understanding knowledge on Switching and Routing |
3 . Should familiar with basic CISCO routing and switching configuration |
Technologies |
---|
1 . Switch Database Management |
2 . IPv4 and IPv6 dual stack |
3 . Switch Virtual Interfaces (SVIs) |
Hardware |
---|
1 . Cisco Catalyst 2960 switch - 1 |
2 . Generic or other cisco switches – 2 |
3 . Desktop/Laptops – 4 |
4 . LAN cables (5mt) – 6 |
5 . Serial DB9 switch console cable – 1 |
6 . Putty or Tera Term (for consoling purpose) |
7 . CISCO Packet Tracer 7.1 or higher |
Note: One kit will be provided per team for practice.
Project Development Lifecycle
Day | Action plan | Detailed Plan |
---|---|---|
Day 1 | Importance and Requirement Analysis | 1. Discussion on Importance of this project for Small Scale organizations 2. Explanation of Advantages and Disadvantages 3. Implementation boundaries |
Day 2 | Understanding Technical requirements | 1. Brief review on technical requirements 2. Understanding default nature of LAN, VLAN and SVIs 3. Limitations of layer 2 network switching |
Day 3 | Implementation Challenges | 1. Altering default behavior of layer 2 switch 2. Configuration planning of SVIs for successful routing with switch 3. Limitations of switching templates for layer 2 routing |
Day 4 | Building the Networks for Routing | 1. Connecting the devices and verifying connectivity 2. Building the network type and routing implementations 3. Saving the configuration for final output |
Day 5 | Testing the static routing | 1. Testing the connectivity for at least 2 different networks 2. Documentation of findings and output |
Day 6 | Network expansion and Project presentation | 1. Possibilities of extending the same plan for middle scale organizations 2. Final project output and presentation |
Team Size and Price
Team Size | Price for Team |
---|---|
4 | 4000 |
Note: A team can have maximum of 4 members.
Tech Coach

Developer