Description
The monitoring and control of city traffic light is becoming a major problem in many countries. The increasing number of vehicles and the lower phase of highways developments have led to traffic congestion problem especially in major cities. Travel time,environment quality, life quality, and road safety are all adversely affected as a result of traffic congestions. In addition, delays due to traffic congestions also indirectly affect productivity, efficiency, and energy losses. The high number of the input & output ports of the PLC will enable this single system to control large number of outputs single handedly. Leakage can also be monitored. The PLC used in this system is a Allen Bradley-1400 which have the more number of I/O's , memory and also easy to operate.
Pre-requisites/Implementation Technologies
Pre-requisites |
---|
1 . PLC Programming |
2 . SCADA Designing |
Technologies |
---|
1 . PLC |
2 . SCADA |
Hardware |
---|
1 . Allen Bradley-1400 PLC |
2 . Switches - 2 |
3 . Lights - 12 |
Note: One kit will be provided per team for practice.
Project Development Lifecycle
Day | Action plan | Detailed Plan |
---|---|---|
Day 1 | Introduction to Project | Introduction and scope of the project, required things for the project |
Day 2 | Introduction to Hardware Equipment | Introduction to the hardware equipment used in the project |
Day 3 | PLC programming | PLC Programming according to project |
Day 4 | Constructing the Hardware | How to connect switches,Lights and other hardware equipments |
Day 5 | Interfacing the PLC and scada | project designing in SCADA and interfacing to the PLC |
Day 6 | Assembling and Testing | Assembling the hardware and testing the project |
Team Size and Price
Team Size | Price for Team |
---|---|
4 | 4000 |
Note: A team can have maximum of 4 members.
Tech Coach

Technical Trainer